|
Debris is lowered into a dumpster via a chute (This reduces danger to public) |
 |
click here for large pic |
 |
|
Installation of separation board (Fastened to deck to prevent wind uplift. Board gives a clean smooth surface in preparation for roofing membrane) |
 |
click here for large pic |
 |
|
Installation of roofing membranes (modified bitumen membrane)(Granular surface eliminates the need for gravel as a barrier to the harmful ultraviolet rays of the sun) |
 |
click here for large pic |
 |
|
Membranes are heat welded together to create one carpet like piece (visible asphalt bleeding at seams ensures no water will penetrate the membrane) |
 |
click here for large pic |